Back
Project Details
- Client: Onward Homes
- Location: Bolton
- Duration: 4 Weeks
- Value: £0.43m
This scheme involved the conversion of one downstairs flat which was previously used for assisted living into two separate properties.
Each property has been fitted out with a New boiler and heating system, Full electrical rewire and connections, Installation of a new kitchen, Installation of a new bathroom, Full decoration and external installation of new steel gates and flagging.